Skip to main content

Evaluation score

An evaluation score (Evaluation Score) is the scoring scale used in schemas and evaluations: a minimum and maximum, with subordinate levels between them.

Path: Sidebar ← Human Resources ← Evaluation scores
Pages: /Entities/HRM/EvaluationScore · /Entities/HRM/EvaluationScore/new · /Entities/HRM/EvaluationScore/{id}

What this screen does​

  • Defines a scale with bilingual names and min/max bounds
  • Manages subordinate levels (Evaluation Score Levels)
  • Is used as a “score type” inside Evaluation schema

Required fields​

FieldWhy it is required
Name (name)Scale identity
Arabic name (nameAr)Arabic display
Minimum (min / Min Score Level)Start of the scale
Maximum (max / Max Score Level)End of the scale (≥ minimum)

Subordinate levels​

After save, score levels appear as child records. Intermediate levels can be added within the range.

Scale endpoints cannot be deleted

The minimum and maximum levels (scale endpoints) cannot be deleted from the UI. Delete only intermediate levels if needed.

Best Practices​

Choose a clear range before building

A range such as 0–100 or 1–5 shapes the levels and Choose Level options in the evaluation.

Link the schema after levels are stable

Do not publish a schema before the score levels are ready for evaluation.